After the concrete is cured, the crew applies waterproofing membrane to the foundation walls installs drains, sewer and water taps and any plumbing that needs to go into the first-floor slab or basement floor and backfills excavated dirt into the hole around the foundation wall. Once concrete is poured into the holes and trenches, it will need time to cure. plumbing drains and electrical chases) and the slab is poured. If it’s slab-on-grade, the footings are dug, formed and poured the area between them is leveled and fitted with utility runs (e.g. If the home is designed with a full basement, the hole is dug, the footings are formed and poured, and the foundation walls are formed and poured. If your home is going to have a well, it will be dug at this point. Footings (structures where the house interfaces with the earth that supports it) are installed. Stage 1: Site preparation & foundation pourĪfter clearing the site of trees and debris, the construction crew levels the ground, puts up wooden forms to serve as a foundation template and digs any necessary holes and trenches. Stages of Construction What are the Stages of Construction?
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |